How To Start Lean Projects When Nothing Can Change

J. Chris White, President, Twilight Training, Rockwall, TX, USA

Keywords: Lean, Balancing, Flow

Industry: Defense/Military

Level: Basic

Abstract

Ideally, when we begin process improvement efforts (especially lean transformation), we would like to change many elements for the process (e.g., change people's job content, move machinery, alter flows). However, sometimes that is not possible. Especially with large defense contractors, many elements of the process are contractually obligated or are not easily changed due to other constraints. In this presentation, the presenter will walk through how he worked with a large defense contractor to initiate changes in the flow and balance of resources to make improvements even when nothing else is allowed to change.


JUST A FEW OF THE LEAN SIX SIGMA WORLD CONFERENCE PARTICIPANTS

Government Organizations




Corporations

““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““
““
““ ““ ““ ““ ““ ““
““ ““
““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““ ““ ““ ““ ““ ““
““

Contact Us: 
Tel: (408) 800-2749
Fax: (866) 500-9081
© Copyright 2021
American Quality Institute
All Rights Reserved.

Log in